Progress claim overdue

Builder short term loan when a progress payment is late: paying subbies from your equity

A late progress claim doesn't pause your subbie pay run. Here's the statutory clock that sits behind the claim, and how property equity can bridge the gap while it runs.

Updated 16 November 2026 · Short Term Caveat Loans lending desk

See if you qualify →No credit check to enquire
Bricklayer's gloved hands laying a brick course on a building site

Quick answer

Yes, a builder can use property equity to pay subbies and suppliers while a progress payment is late. The structure follows the title: a caveat loan in Victoria, a registered second mortgage in every other state, or a short-term first mortgage if the title is clear. $20k to $250k is possible same day when the file is ready, and the loan is repaid when the claim lands.

Key points

  • Security of payment law gives you a fixed timetable for a progress claim, but the money can still arrive after your Friday pay run.
  • In NSW a head contractor's claim is due 15 business days after it is made and a subcontractor's 20, unless the contract sets an earlier date. That's the best case, before any dispute.
  • Property equity can bridge the gap: a caveat loan in Victoria, a registered second mortgage elsewhere, or a short-term first mortgage on a clear title.
  • The exit is the claim itself, so the loan is sized to the gap and repaid when the money lands.
  • Don't wait for adjudication to finish before arranging cover. Line the funding up while the statutory clock runs.

A builder or trade business can use property equity to pay subbies and suppliers while a progress payment is late. The loan is sized to the gap and repaid when the claim lands. In Victoria that’s usually a caveat loan; in every other state it’s a registered second mortgage, or a short-term first mortgage where the title is clear. The point is that the claim is already owed to you. You’re funding the days in between.

This guide walks through the timetable behind a late claim, then the structure and the plan. It’s written for a Friday that is coming faster than the money.

Why does a late progress payment hurt even when the money is owed?

A progress claim can be perfectly valid and still arrive after your costs fall due. Subbies are paid weekly, suppliers cut off at 30 days or less, and wages go out on a set day. The claim follows a different calendar entirely. That mismatch is the whole problem, and it’s a timing problem, not a profitability problem.

It also isn’t a rare one. Construction is the hardest-hit industry in company insolvencies, and the latest ASIC figures, as reported by Accountants Daily, count 3,472 construction companies entering external administration or having a controller appointed in 2025–26, out of 14,152 across all industries. That’s roughly one in four. When one builder or developer in a chain slows down, the cash squeeze travels down to the subbie and supplier who can least afford to carry it.

What is the statutory clock on a progress claim?

In NSW, the other side has up to 10 business days to respond with a payment schedule, and the claim itself is due 15 business days after it’s made for a head contractor or 20 for a subcontractor, unless the contract sets an earlier date. These figures come from the NSW Government’s making a payment claim page.

Here is that timetable laid out. Business days exclude weekends and public holidays, so it runs longer on the calendar than the numbers suggest.

Step (NSW) Timeframe
Respondent gives a payment schedule Up to 10 business days after the claim
Claim due, head contractor to principal 15 business days after the claim
Claim due, subcontractor 20 business days after the claim
Adjudication application if the schedule disputes the claim Within 10 business days of receiving the schedule
Adjudication application if a schedule was given but not paid Within 20 business days of the due date

A subcontractor waiting 20 business days is waiting about a month before the amount is even due. Add a dispute, and you’re comfortably past the supplier’s cut-off. Other states have their own timetables and terms, so check the relevant government page for the state your work is in. The loan decision doesn’t depend on the exact number of days, only on how many you have to cover.

What can the law do for me, and what can’t it?

Security of payment gives you leverage, and leverage isn’t cash. You can serve a notice and suspend work (in NSW, two business days after written notice, continuing until 3 business days after you’re paid). You can apply for adjudication, which is a quick determination rather than a payment into your account. And you can claim interest on late payment.

All of that is worth using. None of it helps with the supplier who stops delivering on Monday. That is why the practical sequence runs on two tracks at once: pursue the claim formally, and fund the gap so the job keeps moving.

Which property-secured structure is fastest for a builder?

The fastest structure is the one that fits what’s already on title. Victoria uses a caveat loan, other states use a registered second mortgage behind any existing lender, and a property with no mortgage can take a short-term first mortgage. All three can be arranged quickly when the file is ready.

Your property Structure What to have ready
In Victoria, with a bank mortgage Caveat loan Title details, mortgage payout, the claim
Outside Victoria, with a bank mortgage Registered second mortgage Title details, mortgage payout, first lender’s consent terms
Any state, clear title Short-term first mortgage Title details, valuation access, the claim
Held in a company or trust Any of the above Who signs, and the trust or company documents

If you want the detail on the interstate route, see our guide to caveat loans outside Victoria. The point for a builder is that the state of your property doesn’t stop you from funding the gap. It only changes the paperwork.

We’re a lender dealing direct, so the answer on structure comes from the same people who decide the loan. If you already know what’s owed and what’s on title, you can tell us where your claim stands and get a straight answer on which route fits.

How do you size the loan to a late claim?

Size the loan to the gap, not to the claim. If the claim is large but only part of it is due before you’re paid, you only need to fund the costs that land first. A smaller loan against equity is cheaper to structure and easier to repay.

Here’s an illustrative example (not a quote). A builder has a $380k progress claim outstanding on a job. Over the next three weeks, they have about $160k in subbie and supplier payments to meet. The builder owns a property valued at $1.4m with a $600k bank loan on it.

Item Illustrative figure
Property valuation $1.4m
Existing bank loan $600k
Short-term loan for the gap $160k
Combined debt on title $760k
Combined LVR about 54%

The loan is a fraction of the available equity, and the exit is the $380k claim. When it lands, the loan is repaid and the title is cleared. If the equity were thinner or the claim were disputed, the sums would look different, and a lender would say so on the first call. For the maths on your own property, how equity is calculated walks through it.

What do the lender and the valuer need to see?

The lender needs two things: confidence in the property, and confidence in the exit. For a builder, the second one means evidence that the claim is real and will be paid.

  • The contract and the payment terms in it
  • The payment claim as served, with the date
  • Any payment schedule the other side has given, including a disputed amount
  • Work-in-progress and certification showing the work is done
  • Title details and payout figures for existing loans
  • A list of the payments you need to make and when they fall due

A disputed claim isn’t an automatic no. It changes what the lender is relying on, so be upfront about it. A claim that’s undisputed, or one where the schedule has already arrived and is for a part amount, is much easier to rely on. Our exit date check helps you test the repayment date against your payment timetable before you apply.

What mistakes make a late-claim loan harder?

Three mistakes show up again and again, and each is avoidable.

  1. Waiting for adjudication to finish before arranging funding. The adjudicator’s decision is a step, not the payment. Line up funding while the clock runs, not after it stops.
  2. Using the whole claim as the loan size. Borrowing more than the gap uses more equity than you need and makes the exit harder to believe.
  3. Not telling the lender the claim is disputed. It will come out at the valuation or in the paperwork, and finding out late slows the file.

A fourth is related to the market rather than to you: if the party owing you is in trouble, the claim might not be paid in full. Be realistic about that and say so, because a plan that relies on a single payment from a struggling payer needs a second exit, such as selling or refinancing the property.

A realistic timeline from enquiry to funded

This is a rough guide for a ready file, not a promise.

When What happens
Day 0 You enquire with the property details and what’s owed
Day 1 Title, payout, contract and claim come in; valuation ordered
Day 1–2 Valuation and structure confirmed; documents out
Day 2–3 Signing, then caveat lodgement (Victoria) or second mortgage registration elsewhere

$20k to $250k is possible same day when everything is in order, and up to $5m possible within 24–48 hours. The common delays are a missing contract, a first lender slow to consent, and a valuer who can’t get access. All three are fixable with a few calls on day zero. For more on how a quick file is run, see what to do when you’ve won the work and the deposit is due, and our page for developers and builders.

Ready to keep the job and the pay run moving?

A late claim shouldn’t cost you a subbie, a supplier or a week on site. If you own property and the money is owed, the gap can usually be bridged without waiting on someone else’s timetable.

The enquiry takes about 60 seconds, and there’s no credit check when you first ask, so your credit file isn’t touched just for finding out what’s possible. Your details aren’t sent to a pile of lenders: a real person reads your answers, looks at your property and the claim, and calls you. Please fill the form in accurately, with the claim amount, the date it was made and what’s registered on title, so we can match the right structure the first time.

Find out where your claim stands →

Red-brick townhouses and units side by side on an Australian suburban street

Frequently asked questions

Can a builder borrow against property to cover a late progress payment?

Yes. If you or your business own property with equity in it, a short-term loan secured against it can cover subbies, suppliers and wages until the claim is paid. The exit is the progress payment, so the lender wants the claim, the contract and the payment timetable. Funding is for business purposes only.

Which structure is fastest for a builder?

It depends on where the property sits and what's already registered on title. In Victoria that is usually a caveat loan. In other states the same job is done with a registered second mortgage, or a short-term first mortgage if the title is clear. $20k to $250k is possible same day with a ready file.

How long can the other side take to pay a progress claim in NSW?

On the NSW Government's page, the respondent has up to 10 business days to give a payment schedule. Unless the contract sets an earlier date, a head contractor's claim is due 15 business days after it's made, and a subcontractor's 20 business days. Other states have their own timetables, so check yours.

Does applying for adjudication stop me needing a loan?

No. Adjudication is a fast route to a determination, not a payment in your account. In NSW you have 10 business days to apply after receiving a payment schedule, and the adjudicator then has a set time to decide. You may still face a pay run before the money arrives.

What if the builder paying me goes into liquidation?

Then the claim may not be paid in full, and a loan that relies on it as the exit is risky for you and the lender. Talk to us before that point, because the plan may need a different exit, such as a sale or refinance of the property.

Can I stop work while I wait to be paid?

In NSW, a claimant can give written notice and suspend work two business days later, and the right continues until 3 business days after payment. Suspension has contract and cost consequences, so many owners prefer to keep the job moving and fund the gap.

How big a loan can I get against my property?

$20,000 to $5,000,000, depending on the equity, the title position and the exit. The usable equity is the valuation less what's already registered, with the lender's loan-to-value limit applied on top. Our borrowing tool gives an indicative figure first.

See what your business could qualify for

One short enquiry, no credit check when you first enquire, and a real person who calls you back with options that fit.

No credit check to ask

The lender, not a broker

A real person on the clock